Our Plans for Jewel Valley
The Jewel Valley site is outlined above. Click to enlarge.
The first step in building the Jewel Valley Project
is to measure wind and solar resources. Enel Green Power North America (EGP-NA) recently received approval from the
County of San Diego's Planning Commission to install testing equipment on
the proposed project site. The equipment includes
four meteorological (MET) towers, seven Sonic
Detection and Ranging (SoDAR) units, and one
pyranometer. A fence will be installed around each
device to ensure safety and proper testing.
If the data collected supports the Jewel
Valley Project,
EGP-NA would then submit an application for a Major Use Permit, which would allow for the
potential construction of the facility. A full environmental review and analysis would be conducted prior
to the County making a final decision on the project.
Environmental Review Process
In preparation for the environmental review process, EGP-NA has begun conducting preliminary avian studies. The company is using a trailer-mounted radar unit, surrounded by a temporary fence, to monitor avian species migration. The radar will be placed on the northern and southern portions of the proposed project site for short duration. This monitoring is just one part of EGP-NA’s extensive biological resource studies.
What are MET Facilities?
 |
 |
 |
| MET TOWERS are
guyed tubular tilt-up towers that
measure wind velocity
to determine whether
a site is viable for a
wind farm. Each tower
would be anchored by
a steel plate and would
not exceed 200 feet in
height. |
SODAR UNITS are self-contained
instruments
that use sound waves
to measure wind speed
at various heights
and the lower layer of
the atmosphere. The
systems stand
roughly six feet tall. |
PYRANOMETERS
include instruments
such as data recording
devices and a small
antenna mounted on
10- to 15-foot tripods.
They measure solar
radiation to determine
the potential for solar
energy. |
|
|
contactUs |
|
|
For more information, contact:
Jennifer Purczynski
(858) 731-5035
|
|
|
|
|
|
stayInformed |
|
|
Sign up to receive updates on our MET facilities and the Jewel Valley Project.
|
|
|
|
|